Level passed
Read the P&ID
EKENE passed "Read the P&ID" in the EDWartens Process lab on 14 November 2026.
Verified by EDWartens
- 4 of 4Steps
- 35 sThis session
What was done
- Click the pressure transmitter on the pump discharge.
- Click the pump.
- Click the tank that feeds the process tank by gravity.
- Click the hand valve a technician closes to isolate…
- Click the controller that holds the circulation flow…
Skills practised
- Process control
- Instrumentation
- SCADA
- Loop tuning
Your turn
EKENE passed it in 35 s. It works in your browser. Nothing to install.
Your turn: try this level. Free, no sign-up.lab.edwartens.com/process-control-simulator/process-read-the-pid