Every project passes the same gates: Requirements review, Design review, Build checkpoint, Client change request, Test / FAT sign-off, Client demo and Handover pack.
- Core: the AI review decides every gate, against the brief and the gate's checklist.
- Pro: your mentor signs off the requirements review, test / FAT sign-off and handover pack; the AI review decides the rest.
- Elite: your Team Lead reviews every gate.
Project 1, in every plan
Parcel sorting conveyor: PLC, HMI and factory acceptance test
Automate a three-lane parcel sorting conveyor: a PLC program in IEC 61131-3, an HMI with alarms, and a factory acceptance test run on a simulated plant before the client signs it off.
You hand over
- Requirements list
- Functional design specification (rev B)
- I/O list and tag database
- Cause and effect matrix
- Alarm list
- PLC program
- HMI screens
- FAT procedure and executed record
Client in the brief: Northgate Logistics (fictional). Industry-simulated, based on Wartens practice. About 40 hours for a first attempt.
Project 2, from 7 weeks
Water tank and pump station: PID level control, duty/standby pumps and SCADA
Automate a booster pump station that keeps a service reservoir at its level setpoint: duty/standby pumps on variable speed drives, a PID level loop in IEC 61131-3, alarms, and SCADA screens with trends, all proven on a simulated tank before handover.
You hand over
- Requirements list
- Process sketch (P&ID style)
- Functional design specification (rev B)
- I/O list and tag database
- PID tuning sheet with step-response records
- Alarm list
- PLC program
- SCADA screens with trends
Client in the brief: Kestrel Water Services (fictional). Industry-simulated, based on Wartens practice. About 45 hours for a first attempt.
Capstone, from 14 weeks
Robot pick-and-place cell: robot program, PLC interlocks and safety concept
Design a robot cell that picks products from an infeed conveyor and packs them into cartons: the robot program in RoboDK or a ROS 2 simulation, a PLC that runs the conveyors and the robot handshakes, and a safety concept to ISO 10218 and ISO 13849 with guarding, a light curtain and safe states.
You hand over
- Cell layout
- Risk assessment (ISO 12100 method)
- Safety concept with PLr per safety function
- Light curtain safety distance calculation (ISO 13855)
- Robot and PLC signal list with handshake diagram
- Robot program and simulation station
- PLC program
- Cycle-time study
Client in the brief: Brightline Contract Packing (fictional). Industry-simulated, based on Wartens practice. About 55 hours for a first attempt.
A plan under 2 weeks carries a shorter version of Project 1, with a build checkpoint and a demo.