Commissioning a solar and EV charging site, in your browser
Commissioning is the stage where a new installation is checked, switched on and proved to work. For a small solar, battery and EV charger site it is a careful routine, and the order of the steps is part of the job. The free Solar and EV lab lets you practise that routine in 3D, in your browser, with no site visit needed.
The video above shows the main steps. Here is what each one means.
Step 1: check the permit and isolators
Before anything is touched, you check that the work is permitted and that the isolators are where you expect them. This is the paperwork and safety part that comes before any testing, and it is easy to underrate until something goes wrong.
Step 2: test the strings
Solar panels are wired in strings. Before you connect a string to the rest of the system, you test it to see that it is healthy and wired correctly. Finding a fault here is far easier than finding it after everything is live.
Step 3: energise in the safe order
Once the tests are good, you switch the site on in a sensible order. A site like this has several sources and loads, including panels, a battery and the grid, so the order in which you bring them in matters. The lab asks you to follow it, and it shows what you have done as you go.
Step 4: the EV charger circuit
Finally you move on to the EV charger circuit and run a charger session. This is the point where the site does the job it was built for, and where you confirm that the charger behaves as it should.
What you learn
The lab teaches the logic behind commissioning rather than a single product. You learn why you check before you test, why you test before you energise, and why the charger comes last. Those habits carry over to larger sites and to other kinds of equipment.
Who it suits
It suits electricians moving into solar and EV work, students in electrical courses, and installers who want to rehearse a routine before a first job. It does not replace the training, rules and certification that apply in your country, and it is no substitute for following the manufacturer instructions on a real site.
Open the Solar and EV lab and commission your first site. It is free to try.
Where to go next
After the solar and EV lab, try the Panel Lab to practise the safe isolation and testing habits on a control panel, or the substation and MCC lab for a different kind of switchroom.
See what other learners have finished on the learner wins page.
Practise with us
Internship
Electrical Design
Free internship: 4 weeks, a free certificate and nothing to buy. Premium adds mentor calls and the graded certificate.
See the internshipRoles
Power and energy
Roles that ask for this skill, 68 open in this country now. Free to see and to apply. We are not a recruitment agency.
See rolesTake the free course
Questions
Is the Solar and EV lab free?
Yes, it is free to try and runs in your browser.
Do I need solar equipment?
No. The site is simulated in 3D, so you practise without any hardware.
What does commissioning mean?
It is the set of checks, tests and switch-on steps that prove a new installation works safely.

Solar PV Commissioning Checklist: IEC 62446-1 Tests

FAT vs SAT: Commissioning Engineer Internship

Factory Acceptance Test Checklist for PLC Panels

Data Center Commissioning Levels L1 to L5 Explained

Protection Relay Testing: Types, Procedure and Equipment

Transformer Testing Types: Routine, Type, Special and Field