Quality and projects

Quality Engineer job simulation

Join the quality department of a components plant as a junior: SPC and Cpk, PFMEA, a customer escape with 24-hour containment, an 8D and an audit.

Quality Engineer job simulation
  • Free: days 1 to 5, about 10 h 5 min of tickets
  • Premium: days 1 to 20
  • Checked as you go
  • Reviewed 19 Oct 2026

The project

You join Brindlemoor Components Ltd (simulated company)

Brindlemoor Components Ltd (simulated company) is a precision component manufacturer in Coventry. You help its team deliver a project for Marlowe Drive Systems (simulated company), at Battery junction assembly line (customer, complaint CC-2026-0112).

You are the new junior in the quality department at Brindlemoor Components. In week one you build a Pareto, calculate Cpk from the diameter chart, review a control plan that nobody has checked and prioritise the PFMEA. Then, on day 4, the customer's line stops because of oversize pins, and you have 24 hours to find every suspect piece and answer. Later you write the root cause, test the gauge, handle a plating dispute, a process change that needs the customer's approval, a gauge found reading low, a request to ship under a deviation and an audit with a gap in the records. The pressure comes from every direction. Your job is to protect the customer, keep the records true and stay useful.

The people in the story are roles, such as Lead Engineer, not real people.

What you will do

By the end you will have

  • Plot the SPC limits and work out Cp, Cpk and Ppk from real-looking measurement data
  • Contain a customer escape within 24 hours: find every suspect piece and write the response
  • Write an 8D with a system root cause, and refuse 'operator error' as one
  • Handle a gauge found out of calibration, a request to ship under a deviation and a gap in the records
  • Hand over an 8D pack and a note that another engineer can pick up

Day by day

The plan, ticket by ticket

Self-paced. A day opens when you hand in the previous day's tickets.
Quality Engineer job simulation plan
DayTicketKindTimeEdition
1Induction: containment, nonconformance and recordsQuiz45 minFree
1Pareto of the rejectsTable1 hFree
2SPC chart and Cpk for the turned diameterCalculation1 h 40 minFree
2Review the control plan against the drawing and the PFMEADocument review1 h 20 minFree
3PFMEA: RPN and Action PriorityTable1 h 10 minFree
3Cpk 0.84 but we sort 100%: ship tonight?Decision30 minFree
424-hour containment response to the customerWriting1 h 10 minFree
4Where is every suspect piece?Table1 hFree
5'Operator error' as the root causeDecision30 minFree
5Raise NCR-3391 for the lots in our warehouseWriting1 hFree
68D D4: root cause and escape causeWriting2 hPremium
6Gauge R&R on the diameter micrometerCalculation2 hPremium
7The plating subcontractor says it is our oilDecision40 minPremium
8Impact note on CR-014Writing1 h 40 minPremium
9Update the control plan to Rev ETable1 h 30 minPremium
10Capability after the changeCalculation1 h 30 minPremium
11A gauge that reads 0.040 mm lowDecision40 minPremium
12Which lots did G-017 touch?Calculation1 h 15 minPremium
13Ship the held lot under a deviation?Decision40 minPremium
14First-pass yield, RTY, PPM and scrap costCalculation1 h 15 minPremium
15Audit tomorrow and a gap in the recordsDecision40 minPremium
16Match the audit requirements to ISO 9001 clausesTable1 h 30 minPremium
17Review the draft 8D closureDocument review1 h 30 minPremium
18Capstone: the complete 8D pack for CC-2026-0112Hand-in4 hPremium
19Handover note for the effectiveness checkWriting1 h 15 minPremium
20A conversation about your own workViva50 minPremium

Real documents

The documents you will work with

Project documents
NumberDocumentRevEdition
BRK-QMS-001Quality procedure extract: nonconformance, containment and recordsCFree
BRK-DWG-4417Contact pin 4.00 x 18.00: drawing summary and characteristicsCFree
BRK-SPC-001SPC and capability reference sheetBFree
BRK-QMS-014Defect log: last four weeks, final inspectionAFree
BRK-CPL-017Control plan: contact pin BRK-4417, series productionDFree
BRK-FME-017Process FMEA: contact pin BRK-4417BFree
BRK-TRC-001Lot traceability: how to read the fileAFree
BRK-CMP-0112Customer complaint CC-2026-0112: oversize contact pinsAFree
BRK-8D-01128D report for CC-2026-0112 (D0 to D3 started)AFree
BRK-NCR-3391Nonconformance report NCR-3391 (form to complete)AFree
BRK-INV-0112Investigation notes for CC-2026-0112APremium
BRK-MSA-004Measurement system study: bench micrometer G-009, diameterAPremium
BRK-SCA-009Plating subcontractor: blister complaint and their replyAPremium
BRK-CAL-002Calibration and verification record: length gauge G-017APremium
BRK-CHG-014Change request CR-014: turning insert, tool-life counter and SPC reactionAPremium
BRK-CPL-017Control plan: contact pin BRK-4417, series production (rev E)EPremium
BRK-KPI-001Quality KPI sheet: last monthAPremium
BRK-CAP-001Audit preparation: requirements and clausesAPremium
BRK-8D-01128D report for CC-2026-0112: draft for closureBPremium

Tools

In the industry, and here

In the industryHere
Statistical software (SPC charts, Cpk, gauge R&R)Your own spreadsheet or notebook on the downloaded CSV files
FMEA and control plan templatesTables in the documents; you calculate RPN and Action Priority and check plans line by line
A quality management system with NCR and CAPA recordsNumbered documents and tickets in the inbox
Measuring equipment (micrometer, length gauge)Measurement data files and calibration records you assess

Standards

The standards the work follows

  • ISO 9001:2015
  • IATF 16949 (customer requirements, used as the model)
  • AIAG FMEA, SPC and MSA methods
  • 8D problem solving

Prepare

Labs and study materials

Free, and linked where a ticket needs them.

What you get

Free, certificate and Premium

Free

Days 1 to 5, every ticket checked, model answers, the 3D lab and a profile entry.

Free

Certificate (optional)

  • A graded, verifiable certificate with your score and band
  • A public verification page and QR code
  • One-click add to LinkedIn as a licence or certification
  • A Verified mark on your profile entry

₹499

Premium

Premium job simulation

  • The full four-week project: change requests, site work, faults and handover
  • A capstone deliverable reviewed by an engineer
  • An AI viva on your own work
  • The graded certificate and a work record PDF with your skill scores
  • Priority help from our team
₹1,499The certificate is included. If you bought it, its price is credited.

On your profile

How it shows on your profile

It shows on your EDWartens profile under Work experience, marked as a job simulation.

Work experience

Quality Engineer (job simulation)

Brindlemoor Components Ltd (simulated company)

10 h 5 min active hours logged · Your dates

Verified, with the certificate

A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

Questions

Quick answers

Do I need to work in manufacturing already?

No. Each task gives you the documents and the formulas. The study links point to free lessons on quality tools, ISO 9001 and spreadsheets.

Is this a real company and real data?

No. Brindlemoor Components and its customer are made-up and the measurement data is synthetic, generated with a drift, a measuring-system error and a lot history. The documents and situations follow what a junior quality engineer meets.

How long does it take?

The free week is about ten hours over five days. The full Premium edition runs over twenty working days and roughly thirty to thirty-five hours, at your own pace.

Which tools do I need?

A spreadsheet is enough. The answers are checked as numbers and choices, so Python or any statistics tool works too.

What do I get at the end?

A work record with your scores by task and skill, which shows on your EDWartens profile under Work experience, marked as a job simulation.

Is the Quality Engineer job simulation free?

Yes, to start. Days 1 to 5 are free. The certificate and the Premium edition are optional and are priced on this page in your currency.

Does it count as work experience?

It shows on your EDWartens profile under Work experience, marked as a job simulation. It is not employment. A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

Keep going

Jobs and internships like this

Last reviewed 19 October 2026.