The project
You join Halvern Power Design Ltd (simulated company)
Wendmoor Creamery is building a new utilities block and has asked Halvern Power Design to design the electrical supply, protection and cabling. You join the design team in week one with a half-finished load list. By the end of week one you have checked the loads, sized the cables and reviewed a drawing. Later, a 75 kW pump arrives late and moves the transformer, the boards, the fault levels and the cables. You carry the change through every document, face a contractor pressing you to energise early, and hand over the pack.
The people in the story are roles, such as Lead Engineer, not real people.