Mechanical maintenance engineer job simulation

A mechanical maintenance engineer job simulation is practice at keeping machinery running safely. In a simulated board and packaging mill you place vibration readings in zones, work out shaft alignment corrections, judge a cavitating pump, isolate a hydraulic press that stores energy, plan a lift and write a bearing failure root cause analysis. It uses documents and calculations, so nothing real is at risk. It is practice, not employment.

Days 1 to 5 are free. No card to start.

See Premium

You join Wyreside Board and Packaging Ltd (simulated company), a corrugated board and carton converter, maintenance department in Preston. Days 1 to 5 are free, with about 9 h 20 min of tickets. Premium continues to day 20. It is practice, not employment.

A walkway with yellow floor markings and railings through a factory floor.
  • Days 1 to 5 free
  • About 9 h 20 min of tickets
  • At a simulated company
  • Works in your browser

The project

You join Wyreside Board and Packaging Ltd (simulated company)

Wyreside Board and Packaging Ltd (simulated company) is a corrugated board and carton converter, maintenance department in Preston. You help its team deliver a project for Wyreside production department, at Converting hall, line CL-3 and utilities (cooling water, hydraulics).

You are the junior maintenance engineer at a board and packaging mill. In four weeks you place a vibration round in its zones, work out a laser alignment, check a lubrication schedule, judge a rattling pump and a belt drive, read an oil report and refuse to leave a guard off. Then a hydraulic baler leaks with stored energy in an accumulator, a crane is past its examination, the only cooling water pump seizes for the third time and a gearbox overheats at night. You write the change, the root cause analysis and the method statement, and hand over a condition-monitoring plan. The skill is to be safe first, evidence-based second, and useful to production third.

  • Maintenance Managercompany
  • Senior Maintenance Fittercompany
  • Reliability Techniciancompany
  • Maintenance Plannercompany
  • Health and Safety Advisorcompany
  • Stores Controllercompany
  • Production Managerclient
  • Shift Team Leaderclient
  • Hydraulic Service Engineervendor
  • Lifting Equipment Engineervendor

Look inside

What the simulator looks like

The workplace, your tickets, the documents and the team chat, as a learner sees them.
  • The workplace of the simulated company in the Mechanical Maintenance Engineer job simulation
    Start in the workplace, with the team around you.
  • The Today screen of the Mechanical Maintenance Engineer job simulation: the morning email and the day's tickets
    Today: the morning email and your tickets for the day.
  • The Work screen of the Mechanical Maintenance Engineer job simulation, listing tickets by day
    Work: every ticket, by day, with its status.
  • A ticket in the Mechanical Maintenance Engineer job simulation with its brief and acceptance points
    A ticket, written the way a colleague would write it.
  • A project document in the Mechanical Maintenance Engineer job simulation with number, revision and status
    A project document with its number, revision and status.
  • The Team screen of the Mechanical Maintenance Engineer job simulation with a chat open with an AI colleague
    Ask a colleague. They are AI colleagues: they help you think, they do not hand out answers.

Screenshots from the simulator. Company, people and data are fictional. Portraits are AI-generated.

Meet the team

The colleagues you work with

You can read their messages and ask them questions. They are AI colleagues, clearly labelled. They help you think a ticket through; they do not hand out its answer.
  • Helen TattersallMaintenance ManagerSimulated colleague, company side
  • Delroy TullochSenior Maintenance FitterSimulated colleague, company side
  • Aisha YardleyReliability TechnicianSimulated colleague, company side
  • Ruth StanhopeMaintenance PlannerSimulated colleague, company side
  • Ewa SzymanskiHealth and Safety AdvisorSimulated colleague, company side
  • Barry SutcliffeStores ControllerSimulated colleague, company side
  • Naveen ThakrarProduction ManagerSimulated colleague, client side
  • Craig WraggShift Team LeaderSimulated colleague, client side

Fictional people. Portraits are AI-generated.

What you walk away with

What you walk away with from the Mechanical Maintenance Engineer job simulation

Run a month in a mill maintenance team: condition monitoring, alignment, stored energy, lifting and a root cause analysis.

What you produce

  • Condition round zone and action listCondition report
  • Lubrication schedule reviewLubrication check
  • Gearbox oil analysis noteCondition note
  • A closed work order with findingsCMMS record
  • Change request for a couplingChange controlPremium
  • Root cause analysis of a bearing failureRCA reportPremium
  • Method statement and risk assessmentRAMSPremium
  • Condition-monitoring planCapstonePremium

Skills you practise

  • Mechanical maintenance
  • Safety and safe systems of work
  • Machinery safety and guarding
  • Condition monitoring (vibration, thermography, oil)
  • Written communication
  • Risk assessment
  • Root-cause analysis
  • Lubrication

Roles to look for

  • Mechanical Maintenance Engineer
  • Maintenance Fitter
  • Multi-skilled Maintenance Engineer (mechanical bias)
  • Reliability Technician

40 live openings on the UK jobs board, checked 22 Oct 2026. See the jobs

Your proof

  • A certificate anyone can verify. Optional, and included in Premium.
  • An entry on your EDWartens profile under Work experience, marked as a job simulation.
  • A work record with your skill scores, with Premium.

What you can talk about at interview

  • You can explain how you placed vibration readings in zones and why the limit depends on the machine.
  • You can walk an interviewer through isolating a hydraulic press with an accumulator, step by step.
  • In Premium, you can talk through a root cause analysis you wrote and a lift you refused because of an overdue examination.

Day by day

Days 1 to 5, ticket by ticket

Self-paced. A day opens when you hand in the previous day's tickets. Every ticket is checked, and you see the model answer after it.
  1. Day 1

    about 2 h 10 min
    • Induction: isolation, stored energy and lifting rulesQuiz · 50 min
    • Condition round: zone, action and temperature statusTable · 1 h 20 min
  2. Day 2

    about 2 h 40 min
    • Laser alignment: tolerance and foot correctionsCalculation · 1 h 20 min
    • Check the draft lubrication scheduleDocument review · 1 h 20 min
  3. Day 3

    about 1 h 40 min
    • P-204 is rattling like gravelDecision · 40 min
    • Belt drive checks on extraction fan F-310Calculation · 1 h
  4. Day 4

    about 1 h 10 min
    • Gearbox GB-301: oil analysis noteWriting · 1 h 10 min
  5. Day 5

    about 1 h 40 min
    • The guard is off and a lorry is waitingDecision · 40 min
    • Close out work order WO-2026-021774Writing · 1 h
Premium: days 6 to 20about 22 h 25 min more

After day 5 the project goes on with a change request, site work, faults, a handover and a capstone reviewed by an engineer.

See the Premium plan

  1. Day 6

    about 1 h 50 min
    • Isolate baler BP-2: put the steps in orderTable · 1 h 50 min
  2. Day 7

    about 40 min
    • Hose spraying, 40 bales to goDecision · 40 min
  3. Day 8

    about 1 h 30 min
    • Check the PUWER guarding assessmentDocument review · 1 h 30 min
  4. Day 9

    about 1 h 40 min
    • Change request: spacer coupling on P-204Writing · 1 h 40 min
  5. Day 10

    about 1 h 20 min
    • NPSH available for P-204, clean and fouledCalculation · 1 h 20 min
  6. Day 11

    about 1 h 30 min
    • Lift plan loads for the M-301 motor changeCalculation · 1 h 30 min
  7. Day 12

    about 40 min
    • The crane has never dropped anythingDecision · 40 min
  8. Day 13

    about 1 h 50 min
    • Root cause analysis: P-204 bearing failureWriting · 1 h 50 min
  9. Day 14

    about 40 min
    • 02:40: gearbox GB-301 at 96 degreesDecision · 40 min
  10. Day 15

    about 1 h 30 min
    • Re-order points for the critical sparesTable · 1 h 30 min
  11. Day 16

    about 1 h 20 min
    • How long should the 6309 bearing last?Calculation · 1 h 20 min
  12. Day 17

    about 2 h
    • Method statement and risk assessment: BP-2 accumulatorWriting · 2 h
  13. Day 18

    about 4 h
    • Capstone: condition-monitoring plan for the converting hallHand-in · 4 h
  14. Day 19

    about 1 h 10 min
    • Reliability of P-204: MTBF, availability and costCalculation · 1 h 10 min
  15. Day 20

    about 45 min
    • A conversation about your own workViva · 45 min

Real documents

The documents you will work with

Each one has a number, a revision and an approver, the way a project document does. You read them, check them and write your own.
  • WBP-HSE-001Machinery safety rules, isolation and liftingRev 4Safety procedure
  • WBP-CMR-041Condition monitoring round, week 41: readings and limitsRev 1Condition monitoring report
  • WBP-ALN-007Laser alignment report, pump P-204 and motor M-204Rev AAlignment report
  • WBP-LUB-000Lubricant register and relubrication rulesRev 2Lubrication standard
  • WBP-LUB-014Lubrication schedule, converting hall, draftRev ALubrication schedule
  • WBP-PMP-204Pump P-204 datasheet and duty readingsRev AEquipment datasheet
  • WBP-FAN-310Extraction fan F-310: drive data and belt inspection sheetRev 1Equipment datasheet
  • WBP-OIL-0412Oil analysis report, gearbox GB-301Rev 1Oil analysis
  • WBP-LOG-009Your notes from the F-310 belt change, day 5Rev 1Shift log
Documents that arrive in Premiumchange requests, records, handover
  • WBP-HYD-003Baler BP-2: hydraulic circuit data and isolation pointsRev BHydraulic schematic and SOPPremium
  • WBP-RA-022PUWER guarding assessment, infeed of line CL-3Rev ARisk assessmentPremium
  • WBP-MOC-001Management of change: coupling on pump P-204Rev AChange requestPremium
  • WBP-PMP-204Pump P-204 datasheet, coupling changedRev BEquipment datasheetPremium
  • WBP-CAL-031Pump P-204 suction conditions and NPSH checkRev ACalculation sheetPremium
  • WBP-LFT-011Lift plan: replace motor M-301 in bay 2Rev ALift planPremium
  • WBP-RCA-027Incident file: P-204 drive-end bearing failureRev ARCA evidencePremium
  • WBP-SPR-001Critical spares list and re-order ruleRev BSpare parts listPremium
  • WBP-PM-001Preventive maintenance plan, converting hall, revised after RCA-027Rev BPM planPremium
  • WBP-CMP-001Condition monitoring plan: requirementsRev ACapstone briefPremium
  • WBP-HOV-001Maintenance handover pack requirementsRev AHandover indexPremium

Tools

In the industry, and here

Tools in the industry and what you use here
In the industryHere
Vibration meter, thermal camera, laser alignment kit, grease gunReadings, reports and alignment numbers given in documents that you check and calculate from
CMMS work orders and close-out notesWork orders and close-out notes as documents and tickets
Permits, isolation procedures, lift plans and risk assessmentsDraft procedures to review and method statements to write
Spreadsheets for spares, reliability and bearing lifeTables and calculations you complete and have checked

Standards

The standards the work follows

  • PUWER 1998
  • LOLER 1998
  • ISO 20816-3 (vibration severity)
  • BS EN ISO 4413 (hydraulics, basics)
  • BS EN ISO 14120 and 14119 (guards and interlocks)
  • ISO 281 (bearing life)

Prepare

Free courses that get you ready

Linked from the tickets that need them. Free, and you can read them before you start.

Your proof, optional

A certificate you can verify

The free days are free. The graded, verifiable certificate is an optional extra, and it is included in Premium.
Sample

Job Simulation Certificate

Your name

completed the Mechanical Maintenance Engineer job simulation at Wyreside Board and Packaging Ltd (simulated company). Graded score band shown on the real certificate.

Number
EDW-JS-0000
Verify
edwartens.com/verification
  • A graded, verifiable certificate with your score and band
  • A public verification page and QR code
  • One-click add to LinkedIn as a licence or certification
  • It is a training certificate. It is not employment, and the company is simulated

Optional: ₹499 in your currency

Premium

Want the full project, reviewed by an engineer?

Premium runs to day 20 and includes the graded certificate. Your free days carry over, and nothing you did is lost.

₹1,499The certificate is included. If you bought it, its price is credited.
  • The full four-week project: change requests, site work, faults and handover
  • A capstone deliverable reviewed by an engineer
  • An AI viva on your own work
  • The graded certificate and a work record PDF with your skill scores
  • Priority help from our team

On your profile

How it shows on your profile

It shows on your EDWartens profile under Work experience, marked as a job simulation.

Work experience

Mechanical Maintenance Engineer (job simulation)

Wyreside Board and Packaging Ltd (simulated company)

9 h 20 min active hours logged · Your dates

Verified, with the certificate

A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

About the Mechanical Maintenance Engineer role

Vibration zones and bearing temperature, worked through

Overall vibration velocity in mm/s rms is a first screen for rotating machinery. ISO 20816-3 gives general guidance by machine group and by how rigid the support is, with four zones from A (as new) to D (severe enough to cause damage). The same reading can be acceptable on one machine and a warning on another.

In the simulation you place six readings from a monthly round in their zones, give the action for each and judge the housing temperature against alert and alarm limits. Then you use each machine's own baseline to set better alert levels.

Laser alignment: offset, angle and shims

Misalignment loads the bearings and the coupling. A laser report gives the offset at the coupling and the angle between shafts. From those you work out the offset at the motor feet and the shims to remove or add, then check them against a tolerance that depends on speed.

The project gives you a pump and motor at 1480 rpm and a soft foot reading. Curing soft foot first is part of the answer, because the numbers are wrong if the foot moves when the bolt is tightened.

Cavitation and NPSH: why a hot pump rattles

A centrifugal pump cavitates when the pressure at the impeller eye falls below the vapour pressure of the liquid. NPSH available must stay above NPSH required by a margin. Hot water has a high vapour pressure, so the margin is small and a blocked strainer can remove it.

You calculate NPSH available with a clean and a fouled strainer, decide what to tell the shift when a pump rattles like gravel, and see why closing the suction valve is the wrong cure.

Stored energy, guarding and lifting in UK practice

Hydraulic accumulators keep a circuit pressurised after the pump stops, and a raised platen can fall. PUWER 1998 requires isolation from every source of energy for maintenance, so the order of steps matters: stop, make the load safe, lock with your own lock, prove, discharge and read zero.

You put the isolation steps of a baler in order, refuse a request to find a leak with cardboard, review a guarding assessment for planted faults and decide what to do when a crane is past its LOLER thorough examination.

Bearing failure root cause and the handover

A bearing that fails three times in 17 months is a system problem. The project gives you an incident file, a bearing life calculation and a reliability calculation, and asks for a root cause analysis with owners and dates. You look at the evidence first and the fix second, which is what a reliability engineer expects.

The capstone is a condition-monitoring plan for six critical assets, with techniques, limits, responses and a first-month calendar. A viva checks that you can explain your own work.

Keep going

Related job simulations, internships and jobs

Last reviewed 19 Oct 2026. Practice, not employment.

Questions

Quick answers

What does a mechanical maintenance engineer do?

They keep pumps, fans, gearboxes, hydraulic systems and lifting equipment working by planned maintenance, fault finding and condition monitoring, and they record what they find so the next shift can carry on. They also work safely around stored energy, guarding and lifting.

What is shaft alignment and why does it matter?

It is lining up the centrelines of two coupled shafts. Misalignment loads the bearings and the coupling and shortens their life, so it is measured, usually with a laser, and corrected with shims and sideways moves.

What is cavitation in a pump?

Vapour bubbles form when the pressure at the impeller inlet falls below the liquid's vapour pressure and then collapse, pitting the impeller and damaging bearings. It usually sounds like gravel and is a suction side problem.

What is stored energy and why is stopping the pump not enough?

Energy can remain after the power is off, for example in a hydraulic accumulator, a raised platen or a loaded spring. Isolation means every source is made safe, locked and proved at zero.

What are PUWER and LOLER?

They are UK regulations from 1998. PUWER covers the safe provision and use of work equipment, including guarding, maintenance and isolation. LOLER covers lifting equipment, including planning of lifts and thorough examination.

Do I need a 3D lab for this?

No. The work is mechanical, so you use reports, drawings and calculations, and compare your answers with worked solutions.

Do I need to be a fitter or a mechanical engineer?

No. The simulation teaches the order of work, the numbers and the safety rules, but it does not make you authorised to work on machinery. Always follow the rules of your own employer and country.

Is the mill a real one?

No. Wyreside Board and Packaging is a made-up company and the site is simulated. The documents, readings and situations follow what a junior maintenance engineer meets.

How long does it take?

The free week is about nine hours over five days. The full Premium edition runs over twenty working days and about thirty-two hours, at your own pace.

Does it use a 3D lab?

No. The work is mechanical, so you work from reports, drawings and data, and calculate the answers yourself. Every calculation shows its working afterwards.

What do I get at the end?

A work record with scores by task and skill, which shows on your EDWartens profile under Work experience, marked as a job simulation.

Is the Mechanical Maintenance Engineer job simulation free?

Yes, to start. Days 1 to 5 are free. The certificate and the Premium edition are optional and are priced on this page in your currency.

Does it count as work experience?

It shows on your EDWartens profile under Work experience, marked as a job simulation. It is not employment. A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

Start the Mechanical Maintenance Engineer job simulation today.