The project

You join Kelbridge Foods Ltd (simulated company)

Kelbridge Foods Ltd (simulated company) is a food manufacturer, maintenance department in Doncaster. You help its team deliver a project for Kelbridge Foods production department (simulated company), at Packing hall and utilities block (MCC-1).

You are the junior maintenance electrical engineer at a biscuit factory. In four weeks you check isolation certificates, practise safe isolation, class a thermography round, close a breakdown work order, find a motor fault, and meet a night trip on the chilled water pump that production wants reset at once. You write the root cause analysis, change a drive that is out of stock, face a hot terminal and a contractor working live, and plan the yearly MCC shutdown. The skill is to be safe first, evidence-based second, and useful to production third.

The people in the story are roles, such as Lead Engineer, not real people.

What you will do

By the end you will have

  • Check an isolation certificate and isolate a motor bucket the safe way
  • Class thermography readings, size spares and read motor insulation tests
  • Refuse a restart without a root cause and write the RCA from the evidence
  • Raise an engineering change request for a substitute drive
  • Plan a shutdown, review arc flash labels and hand over a clear maintenance pack

Day by day

The plan, ticket by ticket

Self-paced. A day opens when you hand in the previous day's tickets.
Maintenance Electrical Engineer job simulation plan
DayTicketKindTimeEdition
1Induction: safe isolation and site electrical rulesQuiz50 minFree
1Check a draft isolation certificateDocument review1 h 10 minFree
2Safe isolation of an MCC bucket3D lab1 h 30 minFree
3Thermography: class and action for each pointTable1 h 10 minFree
3How far over its rating is the mixer motor?Calculation50 minFree
4The isolation boundary is not clearDecision35 minFree
4Close out work order WO-2026-018342Writing1 hFree
5Find the hidden fault and repair it under lock-out3D lab1 h 30 minFree
5Re-order points for the critical sparesTable1 hFree
6A motor that keeps tripping3D lab1 h 50 minPremium
7Motor insulation and PI: fit to run or not?Table1 h 30 minPremium
8Restart the pump without finding the cause?Decision35 minPremium
9Write the root cause analysis for RCA-043Writing1 h 40 minPremium
10Engineering change request for the substitute driveWriting1 h 30 minPremium
11A hot terminal in the compressor bucketDecision35 minPremium
12Commission the substitute drive3D lab1 h 50 minPremium
13The supplier's engineer in a live bucketDecision35 minPremium
14Correct the power factor, and decide on detuning3D lab1 h 50 minPremium
15Check the arc flash labels against the studyDocument review1 h 10 minPremium
16How long will MCC-1 be out, and what does it cost?Calculation1 h 10 minPremium
17Method statement and risk assessment for the MCC-1 shutdownWriting1 h 40 minPremium
18Capstone: the maintenance handover packHand-in4 hPremium
19Reliability of the mixer M-12: MTBF, availability and costCalculation1 hPremium
20A conversation about your own workViva45 minPremium

Real documents

The documents you will work with

Project documents
NumberDocumentRevEdition
KFM-HSE-001Electrical safety rules and safe isolation procedure3Free
KFM-SLD-001Single-line diagram, MCC-1 and packing hall boardsAFree
KFM-WO-018342Work order: CV-07 motor terminal box repair1Free
KFM-ISO-0187Isolation certificate for WO-2026-018342, draftAFree
KFM-THM-014Thermography round, MCC-1, readings and severity rules1Free
KFM-SPR-001Critical spares list and re-order ruleBFree
KFM-LOG-005Your notes from the CV-07 repair, day 41Free
KFM-TST-022Motor insulation and polarisation index records, six motors1Premium
KFM-RCA-043Incident file: CWP-1 drive trip at nightAPremium
KFM-ECR-001Engineering change request: replacement drive for CWP-1APremium
KFM-SLD-001Single-line diagram, MCC-1: drive replaced in -Q44BPremium
KFM-PM-001Preventive maintenance schedule, revised after RCA-043BPremium
KFM-ARC-001Arc flash label review: study table and the labels on siteAPremium
KFM-SHD-001Annual MCC-1 shutdown: activity listAPremium
KFM-HOV-001Maintenance handover pack requirementsAPremium

Tools

In the industry, and here

In the industryHere
Voltage indicator, insulation tester, thermal camera, clamp meterThe MCC lab and the panel lab, with readings you take and tests you record
Work orders and the maintenance systemWork orders and close-out notes as documents and tickets
Isolation certificates, permits and risk assessmentsDraft certificates to review and method statements to write
Spreadsheets for spares, test records and shutdown plansTables and calculations you complete and have checked

Standards

The standards the work follows

  • BS 7671
  • IEC 60364
  • NFPA 70E (safe work practice)
  • IEEE 1584 (study method)
  • ISO 55001

Prepare

Labs and study materials

Free, and linked where a ticket needs them.

What you get

Free, certificate and Premium

Free

Days 1 to 5, every ticket checked, model answers, the 3D lab and a profile entry.

Free

Certificate (optional)

  • A graded, verifiable certificate with your score and band
  • A public verification page and QR code
  • One-click add to LinkedIn as a licence or certification
  • A Verified mark on your profile entry

₹499

Premium

Premium job simulation

  • The full four-week project: change requests, site work, faults and handover
  • A capstone deliverable reviewed by an engineer
  • An AI viva on your own work
  • The graded certificate and a work record PDF with your skill scores
  • Priority help from our team
₹1,499The certificate is included. If you bought it, its price is credited.

On your profile

How it shows on your profile

It shows on your EDWartens profile under Work experience, marked as a job simulation.

Work experience

Maintenance Electrical Engineer (job simulation)

Kelbridge Foods Ltd (simulated company)

9 h 35 min active hours logged · Your dates

Verified, with the certificate

A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

Questions

Quick answers

Do I need to be a qualified electrician?

No. The simulation teaches the order of work, the paperwork and the safety rules, but it does not make you authorised to work on live equipment. Always follow the rules of your own employer and country.

Is the factory a real one?

No. Kelbridge Foods is a made-up company and the site is simulated. The documents, tests and situations follow what a junior maintenance engineer meets.

How long does it take?

The free week is about ten hours over five days. The full Premium edition runs over twenty working days and about thirty to forty hours, at your own pace.

Which equipment brands does it use?

None. The content is vendor-neutral, so it applies to any plant that follows the same standards.

What do I get at the end?

A work record with scores by task and skill, which shows on your EDWartens profile under Work experience, marked as a job simulation.

Is the Maintenance Electrical Engineer job simulation free?

Yes, to start. Days 1 to 5 are free. The certificate and the Premium edition are optional and are priced on this page in your currency.

Does it count as work experience?

It shows on your EDWartens profile under Work experience, marked as a job simulation. It is not employment. A job simulation is a realistic training project at a simulated company. It is not employment, an internship or a work placement. Hours are active hours the learner logged on EDWartens.

Keep going